Charged Alpha
CHARGED ALPHA · RESEARCH PACKET
Companion to the Q4 FY2026 earnings episode · published November 16, 2026

AECOM earnings: Record backlog, a $500m cash bill

AECOM · NYSE: ACMQuarter ended September 30, 2026Results November 16, 2026 (3:05 p.m. CT)Engineering and infrastructure servicesPresented by Hudson & Lana
HOLDConviction 2 / 5Uncertainty: High
Fair value (base)$84.35range $43.71–$108.92
Price, Nov 16, 5:10:04 p.m. EST (after-hours)$76.91+10% to base
Probability-weighted$80.33+4% to weighted present value

HOLD at $76.91 after-hours. Base present fair value is $84.35, with a conditional $43.71–$108.92 range. Design demand supports recovery, but roughly $500m of expected FY2027 project cash use and unresolved claims leave a limited purchase cushion.

Layer 1 · fast

The 60-second read

Q4 gross revenue$3.878bnDown 7.1% reported
Q4 NSR$1.920bn+3% adjusted for working days
Total backlog$28.016bnHalf awarded, half contracted
FY2026 free cash flow$343.8mCompany definition
FY2027 project cash~$500mCompany expected outflow
FY2027 adjusted EPS$6.15–$6.35Company guidance
Base present value$84.35Author estimate
Base 2029 annual IRR13.7%Includes assumed dividends

Five things to know

  1. Gross sales obscure the service trend. Q4 revenue fell, while working-day-adjusted NSR grew 3%; the reported NSR comparison was negative.
  2. Record backlog is not cash in hand. About $14bn is awarded rather than contracted, and backlog definitions differ from NSR.
  3. The old project charge still has a future cash bill. Management expects approximately $500m of FY2027 cash use on two projects.
  4. Adjusted earnings and owner cash differ. Compensation, rentals, recurring spending and investment remain economic costs in the valuation.
  5. The price offers only a modest cushion. Base present value is $84.35 against the dated $76.91 quote; a 20% entry cushion points near $67.48.
Layer 1 · the call

Three scenarios, one probability-weighted number

Present scenario range · USD/share; November 16, 2026 author estimates.
BearBear: $43.71$43.71BaseBase: $84.35$84.35BullBull: $108.92$108.92
BearBear: $43.71$43.71BaseBase: $84.35$84.35BullBull: $108.92$108.92
Show the data
MetricValue
Bear43.71
Base84.35
Bull108.92
ScenarioProbabilityPresent valuevs $76.91What has to happenThe arithmetic
Bear25%$43.71−43%Slower services and extended project spending$850m cumulative project cash in FY2027–2029.
Base50%$84.35+10%Current completion plan, no claim recoveryFY2027 NSR $8.041bn; $500m project cash.
Bull25%$108.92+42%Better service conversion and partial collectionsFY2036 NSR $12.866bn; $200m claim recovery.
Subjective 25/50/25 weights; not statistical probabilities or a loss floor.
Layer 1 · falsifiable

Signposts: what would change our mind

SignpostNow (Q4 FY2026)Green ifRed ifNext check
Conference callFresh release onlyClarifies cash and completionNo transcript incorporated yetNovember 17, 2026
Dividend$0.34 declaredPayment as announcedFuture increases remain discretionaryJanuary 22, 2027
Project completion~$500m annual cash guideOn budget and timetableDelay or new estimated costsLate fiscal Q2 2027
Cash conversion~$300m company FCF guideRunoff subsides and service cash improvesCash remains weak after completionFY2027
Regional execution20.6% / 14.8% Q4 marginsBacklog converts at good marginsWages or mix erode profitabilityNext quarterly results; date unannounced

Separate management targets, reported figures and author forecasts. Claims recovery is upside in the base framework, not required cash.

Price, investment question and call

HOLD at $76.9072, the November 16, 2026 after-hours observation at 5:10:04 p.m. Eastern, displayed as $76.91. Our base present fair value is $84.35 per share. Conditional bear and bull values are $43.71 and $108.92, while subjective 25/50/25 scenario weights produce $80.33. The base comes from the main operating model, not an average of analyst targets or valuation methods. The range is not a confidence interval or a guaranteed limit on losses.

AECOM’s service franchise is showing better evidence: record design backlog, improving International margins and an earnings outlook consistent with renewed growth. The problem is the timing and reliability of cash. Two construction-management projects are still expected to consume roughly $500m during fiscal 2027. A historical charge recognized the accounting loss; it did not eliminate the cash payments required to finish the work.

The stock offers a 9.7% gap to base present value at the dated quote. Our twenty percent purchase cushion would imply an entry near $67.48. That threshold is a decision discipline below fair value, not another deduction from fair value. The conditional September 2029 base outcome, including modeled dividends, produces a 13.7% timed annual return and clears our twelve percent return hurdle. It does not clear the separate purchase-cushion test at today’s reference price.

The distinction matters because a higher-quality business can still be only a fair purchase when unresolved obligations narrow the margin for error. Better evidence of completion, collections and sustainable margins could raise the value. A lower quote could improve the purchase case without any change in the business. This analysis uses the newly released results; the November 17 conference call had not occurred at the research cutoff.

Present value and purchase discipline · USD/share; November 16, 2026 quote and author estimates. The quote is not the regular-session closing price.
After-hours quoteAfter-hours quote: $76.91$76.91Base present valueBase present value: $84.35$84.3520% entry cushion20% entry cushion: $67.48$67.48
After-hours quoteAfter-hours quote: $76.91$76.91Base present valueBase present value: $84.35$84.3520% entry cushion20% entry cushion: $67.48$67.48
Show the data
MetricValue
After-hours quote76.91
Base present value84.35
20% entry cushion67.48

Reported results and the new outlook

Quarterly revenue was $3.878bn, down 7.1% from $4.175bn a year earlier. GAAP operating income fell 4.8% to $225.876m, and continuing net income attributable to AECOM declined 3.0% to $128.076m. Diluted continuing earnings were $0.99 per share. Adjusted operating income was $325.5m and adjusted earnings were $1.63 per share, both stronger than the corresponding prior-year adjusted figures. These measures answer different questions and should not be interchanged.

For the full year, revenue fell to $15.096bn, operating income to $619.697m and continuing net income attributable to common shareholders to $368.782m. The earlier $337m rounded project charge is a major reason the annual profit comparisons are weak. The detailed quarterly filing identifies the exact project estimate loss as $336.8m. We normalize that temporary historical operating distortion when forecasting the service franchise, then retain the future cash burden separately.

Management’s fiscal 2027 outlook calls for four to six percent organic net service revenue growth, adjusted EBITDA of $1.35bn to $1.39bn, adjusted earnings of $6.15 to $6.35 per share, and both segment adjusted operating margin and adjusted EBITDA margin of 17.6%. The earnings reconciliation also gives GAAP EPS of $5.65 to $5.90. The share assumption is 130m diluted shares without potential repurchase benefits.

The cash outlook is much less dramatic than the adjusted earnings recovery: approximately $300m of company-defined free cash flow, including about $500m of project cash use. That is the central qualification beside the earnings guidance. The company also assumes an adjusted tax rate near twenty-two percent, roughly $170m of net interest expense and approximately $160m of general and administrative expense. Forecasts remain management expectations, not reported results.

Quarterly reported and adjusted operating profit · USD millions; AECOM SEC release. Adjusted profit excludes identified costs; it is not cash flow.
Q4 FY2025 GAAPQ4 FY2025 GAAP: 237.4237.4Q4 FY2026 GAAPQ4 FY2026 GAAP: 225.9225.9Q4 FY2026 adjustedQ4 FY2026 adjusted: 325.5325.5
Q4 FY2025 GAAPQ4 FY2025 GAAP: 237.4237.4Q4 FY2026 GAAPQ4 FY2026 GAAP: 225.9225.9Q4 FY2026 adjustedQ4 FY2026 adjusted: 325.5325.5
Show the data
MetricValue
Q4 FY2025 GAAP237.38
Q4 FY2026 GAAP225.88
Q4 FY2026 adjusted325.50

Net service revenue and backlog quality

Net service revenue removes subcontractor pass-through revenue from gross sales. In the fourth quarter, $3.878bn of revenue less $1.958bn of pass-throughs produced $1.920bn of NSR. This is the more useful denominator for the economics of AECOM’s own professional work. It does not mean the subcontracted activity carries no risk, particularly where the company is responsible for completing a project at an agreed cost or timetable.

Reported NSR was below the prior fourth quarter’s $1.967bn. Management’s positive three percent growth figure adjusts for fewer working days and uses the release’s currency conventions. Design growth was six percent on the company’s adjusted basis. The positive operating story therefore should not be described as unadjusted revenue growth. Calendar effects, pass-through mix and construction activity all affect the comparison.

The Americas generated $1.145bn of quarterly NSR at a 20.6% adjusted segment operating margin. International generated $775m at a 14.8% margin, a 270-basis-point improvement. The release attributes International progress to higher-margin market mix and execution, including the United Kingdom and Australia and a return to growth in the Middle East. Maintaining those economics across future work is more important than repeating one record quarter.

Total backlog reached $28.016bn, including $14.009bn contracted and $14.007bn awarded. Design-only backlog was $26.115bn. The overall annual book-to-burn ratio of 1.3x supports demand, but the definitions include proportionate unconsolidated joint-venture work and differ from consolidated NSR. Dividing total backlog by NSR does not produce a reliable number of years of revenue. Selected work can still face contracting, funding, permitting, staffing or scope changes before it becomes collected cash.

Gross revenue to service revenue · USD millions; Q4 FY2026 reconciliation. Gross revenue less pass-throughs equals NSR.
Gross revenueGross revenue: 3,878.43,878.4Pass-through revenuePass-through revenue: 1,958.21,958.2Net service revenueNet service revenue: 1,920.21,920.2
Gross revenueGross revenue: 3,878.43,878.4Pass-through revenuePass-through revenue: 1,958.21,958.2Net service revenueNet service revenue: 1,920.21,920.2
Show the data
MetricValue
Gross revenue3,878.40
Pass-through revenue1,958.20
Net service revenue1,920.20
Backlog composition · USD millions, September 30, 2026. Design-only is a subset across contracted and awarded categories, not an additional amount.
ContractedContracted: 14,009.114,009.1AwardedAwarded: 14,007.314,007.3Design-only totalDesign-only total: 26,115.326,115.3
ContractedContracted: 14,009.114,009.1AwardedAwarded: 14,007.314,007.3Design-only totalDesign-only total: 26,115.326,115.3
Show the data
MetricValue
Contracted14,009.07
Awarded14,007.30
Design-only total26,115.32

How expertise becomes an operating margin

AECOM earns fees through advisory, planning, engineering, design and program management across infrastructure markets. Technical skill, institutional knowledge and repeat relationships can help the business win work across a project’s life. The productive asset is principally a workforce and its accumulated expertise, rather than a factory. That supports attractive capital efficiency when utilization, pricing and project execution are strong.

The same economics create operating sensitivities. Wage inflation can outrun billing-rate increases; scarce specialists can constrain delivery; low utilization leaves salaries without sufficient billable work. Public and private clients can defer projects even after selecting a preferred provider. Market mix matters because different services, locations and contract structures carry different pricing and execution risks. A large backlog helps only if it converts into work with an adequate contribution after people and support costs.

Our base fiscal 2027 margins are twenty percent on Americas NSR and fourteen percent International. Those assumptions produce about $1.414bn of regional segment profit. We then subtract $160m of corporate overhead, a $25m recurring-cost allowance and a small lease normalization. Segment margins are not consolidated owner margins: they exclude corporate expenses and do not represent cash after taxes, reinvestment, financing or minority interests.

The base allows regional margins to improve before fading later gains to 20.2% and 15.2% by fiscal 2036. That avoids carrying the latest record quarter into perpetuity. Technology and advisory investment could support better productivity, but the model does not assume that artificial intelligence removes labor cost without requiring investment or changing fees. Growth still consumes working capital, technology spending and management attention.

Base regional service forecast · USD millions; author estimates, not company segment guidance.
FY2027 Americas NSRFY2027 Americas NSR: 4,806.34,806.3FY2027 International NSRFY2027 International NSR: 3,234.53,234.5FY2036 total NSRFY2036 total NSR: 11,386.411,386.4
FY2027 Americas NSRFY2027 Americas NSR: 4,806.34,806.3FY2027 International NSRFY2027 International NSR: 3,234.53,234.5FY2036 total NSRFY2036 total NSR: 11,386.411,386.4
Show the data
Fiscal yearAmericas NSR $mInternational NSR $mAmericas marginInternational margin
20274,8063,23520.0%14.0%
20285,0473,42920.2%14.5%
20295,2993,61720.5%15.0%
20305,5373,79820.7%15.5%
20315,7593,96921.0%16.0%
20325,9894,12821.0%16.0%
20336,1994,27220.8%15.8%
20346,3854,40020.6%15.6%
20356,5764,53220.4%15.4%
20366,7414,64620.2%15.2%

Project estimates, claims and adjustments

The $336.8m project loss reflects the estimated cost to complete one construction-management project relative to expected revenue and relevant variable consideration. The accounting estimate was recognized in the third quarter. Cash payments continue after recognition, and subsequent information can still change the estimate. Management says the two projects are performing consistently with the previously communicated timetable and budget, including substantial completion of the first phase of one project.

The June filing reported about $620m of significant claims within contract assets, with a majority associated with the two projects. Those balances are not cash. Their recognition depends on accounting estimates, while collection depends on resolving disputed obligations with clients, subcontractors or insurers. The September release reports aggregate receivables and contract assets of $4.360bn, but does not provide a new detailed significant-claims balance. We label the June figure as older evidence.

Our base gives no value to incremental claim collections. The bull assumes $100m in each of fiscal 2028 and 2029; the bear assumes none and increases project spending. Existing claim assets are not added separately to the equity bridge. This prevents treating both recognized accounting assets and hoped-for future collections as two sources of value. The assumptions deliberately separate completion costs from possible recoveries.

Adjusted operating income also excludes restructuring and acquisition costs of $85.4m in the quarter and $139.0m for the year, along with intangible amortization and other identified adjustments. We retain a recurring allowance rather than assuming all restructuring disappears. The June filing’s $26.5m nine-month stock-compensation expense was depressed by an $18.2m performance-award adjustment. A lower accounting expense from revised award expectations does not establish a permanently lower cost of attracting and retaining employees.

Accounting and cash are different exposures · USD millions; the figures have different dates and meanings. They are not additive liabilities. Claims are uncertain receivables, not cash.
Exact Q3 project lossExact Q3 project loss: 336.8336.8June significant claimsJune significant claims: 620.0620.0FY2027 project cash guideFY2027 project cash guide: 500.0500.0
Exact Q3 project lossExact Q3 project loss: 336.8336.8June significant claimsJune significant claims: 620.0620.0FY2027 project cash guideFY2027 project cash guide: 500.0500.0
Show the data
MetricValue
Exact Q3 project loss336.80
June significant claims620.00
FY2027 project cash guide500.00

Cash conversion, leases and liquidity

Fourth-quarter operating cash flow was $366.4m. Net capital expenditure of $92.2m left $274.2m of company-defined free cash flow. For the full year, operating cash flow of $535.6m less net capex of $191.8m produced $343.8m, down from $685.2m in fiscal 2025. The strong fourth quarter should not be annualized: billing and project milestones make cash seasonal, while construction payments can dominate individual periods.

Receivable sales are another cash-quality consideration. The June filing reported $348.9m of sold receivables outstanding, without retained obligations expected to cause material losses. Those sales can affect collection timing. We do not label them as ordinary funded debt or subtract their value again from already-adjusted receivables. Their use still belongs in an assessment of how reliably operating earnings convert to cash.

September cash was $1.242bn and debt before unamortized issuance costs was $2.747bn. Our combined $500m operating reserve includes the June consolidated-joint-venture cash proxy of $250.9m plus parent operating liquidity. The purpose is to avoid assuming every consolidated dollar can be immediately distributed to common shareholders. The exact September split is not provided in the release; the reserve is an author assumption, not a newly reported restricted-cash figure.

All leases are treated consistently as cash rentals. Finance-lease amortization already affects segment profit; the model replaces it with full rental economics and excludes leased-asset amortization from owned depreciation. The June $70.3m finance-lease debt proxy is therefore removed from reported financial debt. Operating lease liabilities are not deducted again. The separate $104.4m pension obligation proxy is deducted once, without an additional recurring deficit-funding charge in forecast cash flow. These dated claims need updating when the full annual filing becomes available.

Reported annual cash conversion · USD millions; company definitions. FY2026 FCF deducts $191.8m net capex from operating cash.
FY2025 FCFFY2025 FCF: 685.2685.2FY2026 operating cashFY2026 operating cash: 535.6535.6FY2026 FCFFY2026 FCF: 343.8343.8
FY2025 FCFFY2025 FCF: 685.2685.2FY2026 operating cashFY2026 operating cash: 535.6535.6FY2026 FCFFY2026 FCF: 343.8343.8
Show the data
MetricValue
FY2025 FCF685.20
FY2026 operating cash535.60
FY2026 FCF343.80
Balance-sheet amounts and model reserves · USD millions. Reserve is an author estimate; debt includes finance leases before the model’s rental normalization.
September cashSeptember cash: 1,242.31,242.3September reported debtSeptember reported debt: 2,746.72,746.7Combined cash reserveCombined cash reserve: 500.0500.0
September cashSeptember cash: 1,242.31,242.3September reported debtSeptember reported debt: 2,746.72,746.7Combined cash reserveCombined cash reserve: 500.0500.0
Show the data
MetricValue
September cash1,242.31
September reported debt2,746.74
Combined cash reserve500.00

Main model, finite runoff and owner value

The main model uses separate Americas and International NSR paths. Reported regional fiscal 2026 NSR totals $7.3284bn. Adding back the exact $336.8m project estimate loss gives a $7.6652bn operating starting point, excluding a small AECOM Capital residual. This is an analytical normalization, not an assertion of reported growth. It also is not a cash addition: the future construction payments remain in the forecast.

Base fiscal 2027 NSR reaches $8.041bn with regional growth of 4.5% and 5.5%. After regional profit, overhead and recurring costs, the model deducts cash taxes of twenty-two percent in fiscal 2027 and twenty-three percent thereafter. Owned depreciation is 1.6% of NSR, while cash capex is $200m in fiscal 2027 and 2.1% of NSR later. Incremental working capital consumes eight percent of NSR growth. An economic cash claim for minority owners starts at $50m and scales with the business, so minority book equity is not deducted again.

The full-year base produces $804.2m of core FCFF before project payments and $304.2m after the $500m construction outflow. After assumed net interest, economic owner cash is approximately $171.6m. That is below management’s $300m free-cash-flow guide. Company cash flow adds back noncash compensation and excludes finance-lease principal classified as financing; our measure retains compensation economically and normalizes all lease rentals. Recurring-cost, capex and working-capital assumptions also differ. The company does not provide enough components for an exact reconciliation, and we do not invent one.

The valuation begins November 16, inside fiscal 2027. We estimate $125m of project payments already made and $375m still ahead. The elapsed amount reduces modeled current cash; the remaining amount reduces future cash flows. Together they equal the same $500m annual burden. No duplicate construction reserve is placed in the equity bridge. Elapsed core cash, interest and the October dividend are also estimated explicitly. Base modeled current cash is $1.101bn, not a reported bank balance.

We discount ten years of cash flows at 9.5%. Beyond fiscal 2036, 2.5% growth requires reinvestment at an eighteen percent return on incremental capital in the base. Terminal value supplies 52.2% of operating enterprise value. After the cash reserve, normalized financial debt, pension proxy and a 130m-share ownership denominator, base present value is $84.35. The company-specific model therefore recognizes a valuable service franchise without pretending that the construction obligations or future compensation are free.

Base operating cash path · USD millions; author full-year economic forecasts. These are FCFF after NCI, not the company’s FCF measure.
FY2027 core FCFFFY2027 core FCFF: 804.2804.2FY2027 after projectsFY2027 after projects: 304.2304.2FY2036 FCFFFY2036 FCFF: 1,253.81,253.8
FY2027 core FCFFFY2027 core FCFF: 804.2804.2FY2027 after projectsFY2027 after projects: 304.2304.2FY2036 FCFFFY2036 FCFF: 1,253.81,253.8
Show the data
FYNSR $mCash capex $mWorking capital $mProject outflow $mFull-year FCFF $m
20278,04120030500304
20288,475178350888
20298,916187350965
20309,3351963401,039
20319,7282043101,116
203210,1172123101,164
203310,4712202801,194
203410,7852262501,217
203511,1092332601,237
203611,3862392201,254
Construction cash is counted once · USD millions. $125m is in estimated current cash; $375m remains in future FCFF. No second bridge reserve.
FY2027 totalFY2027 total: 500.0500.0Assumed elapsedAssumed elapsed: 125.0125.0Remaining forecastRemaining forecast: 375.0375.0
FY2027 totalFY2027 total: 500.0500.0Assumed elapsedAssumed elapsed: 125.0125.0Remaining forecastRemaining forecast: 375.0375.0
Show the data
MetricValue
FY2027 total500.00
Assumed elapsed125.00
Remaining forecast375.00

Independent benchmark and market expectations

Stock Analysis displays a $83.92 average twelve-month target from thirteen analysts, with a $65 to $104 range. Its saved page identifies an October 26 update, so this is pre-release context rather than a synchronized reaction to the new results. The provider attributes consensus data to S&P Global. Our comparable November 2027 model gives $91.58, while the $84.35 headline is present value. Neither figure is substituted for the other’s valuation date.

For an independently motivated economic check, WSP’s announced acquisition of TRC used 14.5x expected calendar-2026 adjusted EBITDA before synergies and before IFRS 16 lease treatment. TRC is an engineering platform, making the transaction more relevant than an unrelated industrial multiple. It still differs in market mix, growth prospects and control terms. The announcement used a $3.3bn purchase price; later filings reported approximately $3.4bn at closing. We preserve 14.5x as the announcement benchmark, not a newly computed closing multiple.

We approximate lease treatment by deducting a $40m finance-rental allowance from AECOM’s $1.37bn EBITDA-guidance midpoint. Pre-IFRS 16 retains operating rental expense, but does not establish that TRC finance leases were treated identically. The available TRC detail is insufficient for a fully matched all-rental comparison. Applying the observed benchmark to $1.33bn and using our same claims bridge and remaining project-cash deduction produces a conditional reference near $129 per share. The quote instead implies about 9.4x on that adjusted basis. This highlights a discount to a control transaction; it does not establish that AECOM deserves the same multiple. We do not average the reference into the DCF.

The reverse operating calculation offers a different interpretation. A constant reduction of about 0.92 percentage point in both regions’ annual growth rates matches the $76.9072 quote, with other base rules fixed. Fiscal 2036 NSR falls to $10.419bn versus $11.386bn in the base. The market allows slower service conversion, but not a complete collapse. Different margins, spending or claims would change that implied growth path.

Valuation clocks and transaction context · USD/share. The transaction reference is conditional and not a target; no method averaging.
Present basePresent base: $84.35$84.35Nov 2027 baseNov 2027 base: $91.58$91.58Control-multiple referenceControl-multiple reference: $128.91$128.91
Present basePresent base: $84.35$84.35Nov 2027 baseNov 2027 base: $91.58$91.58Control-multiple referenceControl-multiple reference: $128.91$128.91
Show the data
MetricValue
Present base84.35
Nov 2027 base91.58
Control-multiple reference128.91

Capital allocation and the ownership denominator

Historical repurchases reduced the weighted-average share count. Fourth-quarter basic and diluted averages were 128.717m and 129.196m, compared with 132.260m and 133.400m a year earlier. The June cash-flow statement records $441.862m spent on repurchases during the first nine months, along with $30.576m of stock-issuance proceeds and $115.469m of dividends paid. Those are reported historical cash flows, not a commitment to repeat the same capital allocation.

Management now emphasizes organic investment and quarterly dividends in the near term. The fiscal 2027 guidance assumes 130m average fully diluted shares without benefits from possible repurchases. We use that number as a forward ownership proxy and assume no additional buybacks or equity issuance. It is not a verified November spot cap table. The latest detailed spot count in the retained quarterly filing is 128.696425m on August 7.

The June award table shows approximately 0.8m restricted units and 0.7m performance units, with $91.9m of unrecognized compensation expense. The release does not provide a complete September award roll-forward. Existing awards are represented through the diluted-share proxy; future replacement compensation remains an economic personnel cost within forecast margins. We do not add back that future expense and then assume a permanently unchanged ownership cost.

The board increased the quarterly dividend ten percent to $0.34, with payment on January 22, 2027 to holders of record January 6. Later dividends in the return model are assumptions, including eight percent annual growth in the base. The October 2026 dividend is already deducted from the interim cash estimate. The remaining cash after interest and distributions stays on the modeled balance sheet; it is not simultaneously credited as a hypothetical repurchase benefit.

Share count and forward ownership proxy · Millions of shares. Quarterly figures are weighted averages; the guidance is a forward proxy, not current spot shares.
Prior Q4 dilutedPrior Q4 diluted: 133.4133.4Current Q4 dilutedCurrent Q4 diluted: 129.2129.2FY2027 share guideFY2027 share guide: 130.0130.0
Prior Q4 dilutedPrior Q4 diluted: 133.4133.4Current Q4 dilutedCurrent Q4 diluted: 129.2129.2FY2027 share guideFY2027 share guide: 130.0130.0
Show the data
MetricValue
Prior Q4 diluted133.40
Current Q4 diluted129.20
FY2027 share guide130.00

Operating sensitivity and the downside mechanism

The strongest downside mechanism combines construction delays with weaker service economics. Subcontractor productivity, completion disputes or new information can raise cash costs beyond the current forecast. Public funding changes, permitting delays or a weaker private investment cycle can slow design work at the same time. The bear model spends $650m, $150m and $50m on the projects across fiscal 2027–2029, assumes no claim recoveries, and lowers growth and regional margins.

That case gives $43.71 of present value. It is not a worst-case floor. Larger litigation exposure, lost work, inaccessible cash or a significant acquisition could create outcomes outside the modeled range. The base assumes no equity financing is needed and retains cash above the operating reserve, but this is conditional on the modeled cash path. Availability under credit facilities is not added to equity as if it were owned cash.

The operating sensitivity grid shows how quickly the purchase cushion can disappear. Two percentage points less annual NSR growth reduces present value to $68.81. A 1.5-point reduction in regional margins gives $73.73. Combining both produces $59.61. These are alternative calculations, not extra deductions piled onto the bear. Working-capital investment, capex and minority cash claims adjust with the changed operating scale.

Rate and terminal-growth sensitivities provide further context. The base discount rate is 9.5%, and the long-run growth rate is 2.5%. A higher discount rate or a shorter competitive advantage can reduce value even when near-term earnings meet guidance. Lease, pension, awards and contract-claims details remain dated proxies until the annual filing supplies a full update. These limitations justify caution about small valuation gaps, rather than an arbitrary additional haircut applied after every risk has already entered the model.

Growth and margin sensitivity · USD/share; author calculations with other base rules fixed.
Growth −2 pointsGrowth −2 points: $68.81$68.81Margin −1.5 pointsMargin −1.5 points: $73.73$73.73Both adverseBoth adverse: $59.61$59.61
Growth −2 pointsGrowth −2 points: $68.81$68.81Margin −1.5 pointsMargin −1.5 points: $73.73$73.73Both adverseBoth adverse: $59.61$59.61
Show the data
Annual growth shiftMargin −1.5 pointsBase marginsMargin +1.5 points
−2 points$59.61$68.81$78.00
+0 points$73.73$84.35$94.96
+2 points$90.16$102.42$114.68
Discount-rate sensitivity · USD/share at 2.5% terminal growth; author sensitivity, not alternative company guidance.
8.5% WACC8.5% WACC: $101.40$101.409.5% WACC9.5% WACC: $84.35$84.3510.5% WACC10.5% WACC: $71.53$71.53
8.5% WACC8.5% WACC: $101.40$101.409.5% WACC9.5% WACC: $84.35$84.3510.5% WACC10.5% WACC: $71.53$71.53
Show the data
Discount rate1.5% growth2.5% growth3.5% growth
8.5%$94.90$101.40$110.40
9.5%$80.25$84.35$89.73
10.5%$68.87$71.53$74.89

Dated checkpoints and shareholder returns

The November 17 conference call is the immediate information event. This packet does not claim knowledge of that future discussion. Subsequent quarterly reporting should clarify actual project payments, claims progress and the extent to which record design backlog converts into NSR. A better explanation of cash conversion would matter more than another unqualified statement about the size of the opportunity.

Management expects the second construction project near completion at the end of fiscal 2027’s second quarter and expects the major cash headwinds to subside by the end of that first half. Completion on the announced timetable, without another cost revision, is a direct test of the base scenario. Actual claim collections would strengthen the case, but the base does not require them. Delay or additional spending would move the model toward the bear.

Our September 30, 2029 conditional prices are $54.55 bear, $106.23 base and $137.77 bull. Dividends are modeled at separate dates, producing scenario-specific annual IRRs of approximately minus 9.5%, plus 13.7% and plus 24.2%. Those are not probability-weighted IRRs and not simple present-value gaps. Only the next January dividend is declared; later dates and increases are assumptions. The price outcomes revalue remaining cash flows and retain cash after net interest and distributions.

For the operating thesis, watch regional growth and margins together. International catch-up is attractive only if it survives changing market mix. Americas backlog needs to become billed and collected work without replacing old construction problems with new ones. We would become more constructive through verified completion, cash collection and durable service returns, or through a price with a larger cushion. We would reduce confidence after new cost estimates, prolonged disputes or weaker conversion despite reported backlog growth.

Conditional September 2029 prices · USD/share at September 30, 2029; future values, not today’s fair values. Returns include modeled dividends.
BearBear: $54.55$54.55BaseBase: $106.23$106.23BullBull: $137.77$137.77
BearBear: $54.55$54.55BaseBase: $106.23$106.23BullBull: $137.77$137.77
Show the data
CaseFuture priceCumulative dividendsTotal returnTimed annual IRR
Bear$54.55$3.74−24.2%−9.5%
Base$106.23$4.0843.4%13.7%
Bull$137.77$4.1684.5%24.2%

Sources, calculations and disclosure limits

The new financial figures come from AECOM’s November 16 SEC earnings exhibit. Detailed awards, lease, pension and claims information comes from the preceding quarterly filing and is dated accordingly. The full fiscal 2026 annual report was not available in the retained submissions at the research cutoff. We do not present older detailed balances as newly reported September values. Market prices and analyst targets are separately timestamped.

The displayed driver tables explain the main calculations. Regional NSR multiplied by segment margins produces segment profit. Corporate costs, recurring expenses, taxes, owned investment, working capital and minority economic cash claims convert that profit into FCFF. Construction payments and any scenario recoveries are then applied in their respective years. The current-cash estimate and future-cash forecast split elapsed payments from remaining payments so the same cost is not counted twice.

The equity bridge adds modeled current cash and subtracts operating liquidity, normalized financial debt and the pension proxy. All leases use cash-rental economics, and minority claims are already removed from operating cash. A 130m forward diluted-share proxy produces per-share values. No separate value is added for recognized contract claims, unconsolidated joint-venture investments whose earnings are already included, credit facilities or hypothetical future buybacks.

Rounding is for readability. Financial statements are generally shown in millions of U.S. dollars, while the model retains the detailed amounts provided in the tables. Scenario weights are subjective judgments about operating outcomes, not calibrated frequencies. The independent transaction reference has a different control and growth context; it is not averaged into the base value. Readers should challenge the growth, margins, project timing and cash assumptions directly rather than interpreting the precision of a calculated price as certainty.

Primary sources: AECOM Q4 and FY2026 results; AECOM preceding quarterly filing and detailed notes; WSP announced TRC transaction; WSP Q3 2026 transaction accounting. Market context: Yahoo Finance ACM quote; Stock Analysis / S&P Global analyst snapshot. All forecasts and valuation judgments are Charged Alpha author estimates.